Bilmar Foods (Sara Lee)
Storm Lake Iowa
- Design
upgrade booster system. Replace aging rotary compressors with
single screw machine.
Dillon's Distribution Center
Hutchinson, Kansas
- Review PSM procedure.
OSHA audit update. PSM program and tag & label all ammonia piping.
Update P&Id Drawings
Keebler Baking Company
Louisville, Kentucky
- Design and install
production line refrigeration system for Girl Scout Cookies Chocolate
Mint Line.
Project Value: $350K
Good Humor
Henderson, Nevada
- Replace existing
NH3 condensers and modify piping.
Kraft
Garland, Texas
- Design condenser
replacement and supply equipment.
Lincoln, Nebraska
- Design/build central
chiller and glycol system for Poppycock Popcorn Line.
Morningstar Foods
Arlington, Tennessee
- Replace condenser.
Upgrade existing chillers. Refrigeration survey.
Mother’s Cookies (Keebler
Baking Co.)
Louisville, Kentucky
- Engineer, design
new installation for warehouse air conditioning. Upgrade tunnel
refrigeration. Upgrade existing system to handle glycol cooling
system for warehouse.
- Complete warehouse
area cooling system with ammonia glycol design/build.
- Design thermosyphon
system and replace 2 x 30Tr. plate exchangers with new 100 Tr. Unit
for glycol cooling.
Purity Dairies
Nashville, Tennessee
- Design and install
condenser replacement additional 1200 Tr.
- Replace control
pressure receiver on ice cream. Design and install CPA unit
on blow mold operation.
- Update PSM. Complete
three year audit. Update P&Id Drawings.
Reiter Dairy
Akron, Ohio
- Upgrade existing
NH3 system for dairy operations.
Timet Corporation
Henderson, Nevada
- Design/build Ammonia
refrigeration system for T1CL4 Chillers.
Purity Dairy
Nashville, Tennessee
- New milk cooler,
piping design and installation of equipment for additional 660 Tr.
Project value: $1,000,000